Indonesian flag
BlogReferencesNews

Instant LNG to Indonesia

By
Magnus Eikens
and
May 25, 2020
10
minutes read time

Indonesia is the largest archipelago in the world, with a population of over 250 million, where the majority is located on five major islands and about 30 smaller groups. The nation is the largest energy consumer in the Association of Southeast Asian Nations (ASEAN), accounting for more than 36% of the region's energy demand.

Electricity Pricing; Challenges and Opportunities

Electricity prices in the eastern part of Indonesia are up to five times higher than in the central part of the country, forcing the Government to heavily subsidizes energy costs.

Natural gas offers a transition to an environmentally cleaner future while satisfying the increasing demand for energy within Indonesia and the region. Indonesia has several substantial LNG liquefaction export terminals that potentially offer a solution to supplying the nation's gas needs.

A major roadblock in supplying LNG to the dispersed island nation, is the very high cost to build LNGC receiving terminals with associated mooring infrastructure, including dredging. Subsequently, the majority of small to medium scale projects focused on LNG import do not survive past the concept or feasibility stage.

Commercially it is well appreciated that market demand for LNG has been growing and will contribute significantly to Indonesia's national energy mix. The market is rapidly emerging for small to medium scale LNG importation; however, how can this be exploited?

The solution may lie with floating LNG receiving technologies - now being commercialized and implemented reducing infrastructure costs to commercially acceptable levels.

An example of such technology are FSRU and ECONNECT Energy's Jettyless floating IQuay that removes the current roadblock of high LNG receiving infrastructure costs. The IQuay is further described later in this article.

The Challenges for Natural Gas In the ASEAN Region

Countries going through socio-economic growth, increasing living standards, and technological change often have the associated challenges of sustainable governance, long term infrastructure planning, and development to improve the quality of life for their population without placing an unfair burden on future generations. The decision to make the conversion from coal, fuel oil or diesel to LNG for power generation, also relies on the LNG buyer obtaining reliable supply at a competitive price and the seller having security in payment and understanding the buyers' demand for LNG.

Indonesia as a Case Study

Indonesia is made up of many dispersed islands, separated by deep seas. As a result, it would be costly to establish integrated regional infrastructure, such as pipelines and power grids, leaving many of the islands without clean and cheap energy.

indonesia map
Figure 1:   Map of Indonesia

Across the Indonesian archipelago, electricity is mainly generated from coal, diesel, or gas-fired power plants. While coal remains the most widely used, fossil fuels contribute significantly to the production of high Carbon Dioxide (CO2) and air pollution levels. Furthermore, diesel have typically been one of the most expensive fuels in Indonesia, which makes many of the existing aging plants costly to operate and maintain.

The coal-fired power plants in Indonesia emit several hundred thousand tonnes of pollutants annually such as mercury, lead, cadmium, and toxic particulate matters (PM2,5). A report from 2015, based on research done at Harvard University, states that coal-fired power in Indonesia causes about 6500 premature deaths, and each 1000MW of coal-fired capacity is estimated to result in another 600 deaths annually due to chronic diseases in elderly and respiratory infections in children.

Utilizing LNG for power generation would eliminate the emissions of Nitrogen Oxides, SOx, and fine particles, enable a 29% reduction in CO2 emissions when compared to standard fuel oil and 37% when compared to coal.

Government Subsidies for Electricity Supply

In the eastern regions, electricity prices can be up to five times higher than in the central parts of the country, such as Java and Bali, as shown in Figure 2. Indonesia provides some of the world's most extensive subsidies for internal electricity use. Electricity prices have been set at low levels, with the Government of Indonesia (GOI) making transfers to Indonesia's electricity utility, Perusahaan Listrik Negara (PLN), to cover losses.

In an ambitious reform program, since 2013, Indonesia has taken significant strides to reduce the subsidy bill. The reforms have involved raising electricity prices to levels that reflect costs.

However, The Ministry of Energy and Mineral resources, and the House of Representatives, recently agreed to further increase the electricity subsidies in the 2020 state expenditure budget to Rp62,21 Trillion (or USD 3,98 Billion in the exchange rate of USD1 = Rp15590,05 April 22, 2020), an increase of more than 7% from the previous year.

electricity prices on indonesian islands
Figure 2: Difference in electricity prices on various Indonesian islands (Source: Afianto, 2013).

Transition to Cleaner Energy

Indonesia is currently facing the challenges of sustainable development and the need for clean and affordable energy while planning to significantly reduce the Government's subsidy burden over time. Power generation projects are aiming to meet the increasing power demand while transitioning over to LNG, as well as renewable sources to phase out diesel and coal, thereby reducing health hazards associated with the production of CO2, Sulphur Dioxide & Nitrogen Oxides produced by aging power plants.

Moreover, solutions enabling natural gas for power generation has been investigated ever since an extensive PLN-financed study suggested the promising potential of LNG back in 2010. Since then, significant progress has been made, most recently exemplified by PLN signing an initial 20-year gas purchasing deal with Pertamina in February this year. Taking on 167 billion British thermal units (Btu) of gas a day (1,237Mtpa), PLN is planning to reduce its diesel consumption with more than 60% within two years. PGN (a subsidy of Pertamina) is committed to spending USD 2,5 billion on the development of LNG receiving terminals and distribution facilities. The LNG will be used to fuel 52 power plants with a combined capacity of 1870MW. The power plants will be modified to run on natural gas, starting with five power plants of 430MW in combined capacity this year.

An efficient transition is crucial as the country is under enormous economic growth pressure. By 2030, Indonesia is projected to take over Germany's place as the 7th largest economy in the world. In order to meet both their own and UN’s Developmental Goals, the economy needs to grow sustainably; availability of electricity for the industry and consumers should follow.

LNG Terminals

  • Nusantara Regasification Plant consisting of a 125,000 m3 FSRU receiving terminal located in Jakarta Bay. Output capacity of 3 Mtpa completed in 2012.
  • Lampung Regasification Plant consisting of an FSRU 170,000 m³ receiving terminal located SW Sumatra completed 2014. Output capacity of 1.8 Mtpa.
  • The Arun LNG receiving facility is located in Aceh with a capacity of 3Mtpa. This was the world's first conversion from production to an import receiving terminal.
  • The Jawa-1 Power Project (currently under construction) in West Java. The expected completion is during 2021 and includes an FSRU with a storage capacity of 170,000m3 and re-gas capability of 300 Mmscfd.
  • Bali FSRU located in Benoa that includes an FSRU of 26,000 m3 LNG storage capacity. The Benoa FSRU receives around 0.3Mtpa LNG from the Bontang liquefaction plant and delivers gas to a 200MW gas-fired power plant located 3.7 km away from the receiving facility. The original Benoa power plant before 2015 used fuel-oil and diesel for power generation. A new power plant capable of using diesel or natural gas was constructed in 2016. The small scale FSRU receives LNG from Bontang provides storage and regasification for the local upgraded power plant.

Small Scale LNG – Model

The Bali FSRU was seen as a ground-breaking initiative by the state-owned electricity company PT Perusahaan Listrik Negara (PLN). It was recognized as a solution and a model for future power generation developments in the region, offering several positive steps towards eliminating the Government's fuel subsidy, lowering CO2 output, and providing a cleaner environment.

Switching to LNG

With the infrastructure and technology already available today, the paradigm shifts towards flexible LNG delivery solutions is taking shape, as evident in Bali and other locations. Small to medium scale floating infrastructure is paving the way for solutions that can satisfy continuous and Peak Shaving demands.

LNG powered vs coal fired power plant
Figure 3: LNG Powered vs. Coal fired power plant. A traditional power plant can be modified to generate power from LNG, reducing GHG emissions.

lng overview in indonesia
Figure 4: Overview over Gas/ LNG overview in Indonesia (Source: PLN)

Moving Forward with Small & Medium Scale Receiving Opportunities

Small to medium scale land-based terminals, whether constructed for receiving an LNGC or to accommodate a long term berth for an FSRU, have the inherent disadvantages of high construction and dredging costs. These, combined with long delays often associated with obtaining permits and environmental approvals, all culminate in long project lead times.

The Jettyless + LNG Package Solution

The concept of constructing small to medium scale receiving terminals seems the right solution for bringing energy to isolated cities and regions or when a transition to LNG is being sought. However, the associated cost often proves financially non-viable and often regarded as a roadblock to development. Floating solutions, in many cases, are being considered as an alternative to land-based fixed receiving terminals and have emerged into the mainstream, offering greater flexibility, reduced cost, time, and significantly less impact on the maritime environment.

Dredging is usually required to remove unwanted deposits in water pathways, which alters the existing soil composition on which much of the life undersea is dependent upon to survive. Moreover, the new soil composition may cause the creation and spread of harmful organisms in addition to existing contaminations previously being stored in the soil.

The jettyless solution from ECONNECT Energy called the IQuay, developed together with Naturgy Energy Group, does not require a land-based jetty or the associated loading arms. It may also negate the need for a large-scale FSRU altogether by the alternative onshore or near- shore storage and re-gas facilities, which are now almost "off the shelf" in modular form.

Consider an LNGC moored to a conventional spread mooring, offshore in a water depth no greater than what it requires to accommodate the vessel's draft itself; neither a jetty nor dredging is required. Consequently, environmental concerns and permitting issues are greatly simplified by the IQuay solution. The IQuay platform, floating cryogenic hoses, and control systems being constructed at an offsite yard significantly reduce delays associated with site-based construction, adding another vital element to achieving a fast track solution.

Compared with conventional fixed jetty infrastructure, the IQuay offers a substantially lower capital cost solution and a significantly reduced timeline to first gas. The IQuay may also provide a solution to other types of LNG loading, including bunkering. It is also interesting to note that many types of liquids, chemicals, or even bulk materials can be loaded using the IQuay.

The concept of bringing LNG to Indonesia, jettyless, is hence introduced by ECONNECT Energy, also combined with LNG from Naturgy Energy Group. This turn-key solution, where import infrastructure, whether an onshore terminal, Floating Storage Unit, or barge, can be put in place to provide a simple PPA structure whereby the jettyless IQuay technology is an integral part of the solution. The scope for this joint development offers the IQuay solution, technical support, and the possibility of a flexible LNG supply.

jettyless transfer system
Figure 5: The jettyless IQuay is a means to transfer LNG from point A to B, and can be combined with various types of LNG terminals (floating and non- floating). The system can be combined with LNG from Naturgy Energy Group for the Indonesian Market.
applications for jettyless transfer system
Figure 6: ECONNECT Energy’s patented IQuay solution, Copyright developed together with Naturgy Energy Group
DirectLinkLNG® comprises ECONNECT Energy's IQuay, the LNG terminal facility, LNG Carrier, and LNG Supply, i.e., everything needed to receive LNG at the doorstep.

References

  • Afianto, M. T. (2013) ‘Small scale LNG, the best suited for Indonesia’s archipelagos’, in IGT International Liquefied Natural Gas Conference Proceedings.
  • Gas Technology Institute, pp. 1274–1281.
  • APEC (2019) ‘Small-scale LNG in Asia-Pacific’, (September)
  • Ariyanti, D. (2017) Energy infrastructure: Connecting gas pipelines in Java Island. Available at: https://www.pwc.com/id/en/media-centre/infrastructure-
  • news/infrastructure-news---archive/october-2017/energy-infrastructure--connecting-gas-pipelines-in-java-island.html (Accessed: 13 December
  • 2019).
  • FY2018 (2019) FY2018 Study on business opportunity of High-quality Energy Infrastructure to Overseas ‘Development of Feasible Project Structure for
  • LNG Distribution and Power Plants(LDPP) in Eastern Indonesia’ Final Report.
  • Hakam, D. F. and Asekomeh, A. O. (2018) ‘Gas monetisation intricacies: Evidence from Indonesia’, International Journal of Energy Economics and Policy.
  • Hamdi, E. and Maskan, F. (2005) MID SCALE LNG DEVELOPMENT FOR MONETIZING STRANDED GAS IN INDONESIA. Available at:
  • transcanada.com/company/CNG_stra (Accessed: 12 December 2019).
  • IGU (2019) 2019 WORLD LNG REPORT .
  • ‘Rambu Energy Newspaper’ (2019) PLN still evaluating bids for 5 FSRUs – Rambu Energy. Available at: https://www.rambuenergy.com/2019/02/pln-still-
  • evaluating-bids-for-5-fsrus/ (Accessed: 14 December 2019).
  • RMM (2011) Riviera Maritime Media - News Content Hub - Indonesian milk runs in the offing. Available at: https://www.rivieramm.com/news-content-
  • hub/news-content-hub/indonesian-milk-runs-in-the-offing-42940 (Accessed: 13 December 2019).
  • RMM (2019) Riviera Maritime Media - Infrastructure to Overseas : “Development of Feasible Project Structure for LNG Distribution and Power Plants(LDPP)
  • in Eastern Indonesia” Opinion - A feather in the LNG cap: new FSRU bolsters expertise in China and Indonesia. Available at:
  • https://www.rivieramm.com/opinion/opinion/a-feather-in-the-lng-cap-new-fsru-bolsters-expertise-in-china-and-indonesia-22069 (Accessed: 14
  • February 2020)
  • The Jakarta Post (2018a) Pertamina Reaches Financial Close on $1.8b West Java Gas Power Station Project. Available at:
  • https://jakartaglobe.id/context/pertamina-reaches-financial-close-on-1-8b-west-java-gas-power-station-project (Accessed: 14 December 2019).
  • The Jakarta Post (2018b) PLN holds tender for five FSRU projects - Business - The Jakarta Post. Available at:
  • https://www.thejakartapost.com/news/2018/10/03/pln-holds-tender-for-five-fsru-projects.html (Accessed: 12 October 2019).
  • Putra, D. D. et al. (2019) ‘A Study on conceptual design of mini FSRU as LNG receiving facility’. doi: 10.1088/1757-899X/588/1/012026.
  • WPR (2019) Developing Countries 2019. Available at: http://worldpopulationreview.com/countries/developing-countries/ (Accessed: 18 December 2019).
  • Mitsubishi Heavy Industries, Ltd. Kawasaki Kisen Kaisha, Ltd. (2018) Study on business opportunity of High-quality Energy
Last updated:
Apr 25, 2023

This article is co-written by Magnus Eikens and Thomas Vincent Borgersen.

Want to learn more?

Read more about jettyless LNG here

Magnus Eikens

About

Magnus Eikens

Chief Commercial Officer
As co-founder of ECOnnect, Magnus has developed and brought to life the world's first jettyless transfer system. He holds a decade of experience in business development, strategy and commercialization, and is also a member of the Board of Directors of Energy Network Norway (ENN): a network of industry professionals and global companies leading Norway’s commitment to Clean Energy.

About

More articles

ECOnnect 2024 - wrapped up

ECOnnect 2024 - wrapped up

Dec 19, 2024
minute read

In 2024, ECOnnect achieved new heights with significant projects, global partnerships, and industry recognition. From enabling LNG production in Mexico to advancing green energy infrastructure in Europe and Africa, we continued redefining marine infrastructure through innovative solutions. Recognized with prestigious awards like EY Entrepreneur of the Year and Deloitte’s Technology Fast 50, we are excited to build on this momentum in 2025. Explore our journey and discover how we’re shaping the future of sustainable energy.

ECOnnect Founders Advance to National Finale in EY Entrepreneur of the Year

ECOnnect Founders Advance to National Finale in EY Entrepreneur of the Year

Nov 19, 2024
minute read

The founders of ECOnnect Energy have secured a spot in the EY Entrepreneur of the Year national finale after winning the regional finale in Oslo on November 12.

ECOnnect nominated for the Innovation Award by the Research Council of Norway

ECOnnect nominated for the Innovation Award by the Research Council of Norway

Nov 14, 2024
minute read

ECOnnect Energy is proud to be named a finalist for the 2024 Innovation Award by the Research Council of Norway. Our commitment to research and innovation in sustainable energy solutions has earned us a spot among Norway’s top innovators.

1

Share information with us about your project (confidential).

2

Our domain experts will evaluate your project parameters to ensure Jettyless is a viable and optimal solution.

3

Work with us to further mature the project definition and gain access to our marine and process experts.

4

Realise your infrastructure project by cutting costs and project plans.

Let's talk about your project

Our team will get in touch with you shortly.